Install three new Pig Receivers on Host Platforms  (Ubit & Usari) for the incoming crude Pipelines from Wellhead Platforms.

Technical Data:

Two Pig Receivers for 16” Pipelines and one for 12” Pipeline, including associated utilities and tie-ins; Installation on Main Deck and Cellar Deck on Usari, and on a Main Deck extension on Ubit.

ILF Services:

  • As-Built surveys
  • Assessment of the chosen location for the new Pig Receivers
  • Hazardous Area Classification
  • Constructability Review
  • HAZOP Review
  • SAFE Charts
  • Instrumentation Loop Diagrams
  • Flow and Process Simulations and P&IDs review & update
  • Depressurization Study
  • Structural calculations
  • Piping stress analysis
  • Detailed Engineering
  • Equipment Layouts, Piping Layouts, Isometrics, Safety Layouts
  • Tie-ins for the new process and utilities piping, and instrumentation
  • PDMS Model of the altered locations
  • RFQ Packages