Usari Pressure Maintenance Project
Project | Usari Pressure Maintenance Project | |
Client | MOBIL PRODUCING NIGERIA UNLIMITED | |
Country | Nigeria | |
Project-Period | 2004 - 2005 |
Purpose:
Installation of a new platform incl. water injection and produced water treatment facilities and in order to increase production capacities in almost exploited oil fields.
Technical Data:
New Usari Water Injection Platform:
- Injection capacity: 120,000 bpd
- Water Treatment capacity: 60,000 bpd
- Modifications to the existing Usari Production
- Platform & Facilities (bridge connection to new facilities)
ILF Services:
- Basic Engineering
- Safety and optimization studies
- Review and verification of Pre-FEED engineering work
- Global review of existing structural, process and utility systems
- EPIC project schedule
- EPIC cost estimate
- ITT and Scope of Work for the EPIC Lump Sum bid packages
- Requests for Quotation